• Construction of a Preliminary Conceptual Site Model Based on a Site Investigation Report for Area of Concerns about Groundwater Contamination
  • Juhee Kim1,2·Min Seo Bae1,2·Man Jae Kwon1,2·Ho Young Jo1,2·Soonjae Lee1,2*

  • 1SMART-SEM (Subsurface Environment Management) Research Center
    2Department of Earth and Environmental Science, Korea University

  • 지하수 오염우려지역 실태조사 보고서 기반의 사전 부지개념모델 구축
  • 김주희1,2·배민서1,2·권만재1,2·조호영1,2·이순재1,2*

  • 1스마트 지중환경 관리 기술 연구단
    2고려대학교 지구환경과학과

  • This article is an open access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/4.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.

References
  • 1. BGS, 2021, BGS Groundhog v2.6, https://www.bgs.ac.uk/technologies/software/groundhog/ (Mar, 18th 2022).
  •  
  • 2. DTSC, 2008, APPENDIX A1 CONCEPTUAL SITE MODEL, Department of Toxic Substances Control California Environmental Protection Agency (https://dtsc.ca.gov/wp-content/uploads/sites/31/2018/11/PT-R_Metals_Main_Text_0808-2.pdf).
  •  
  • 3. ITRC, 2018, TPH Risk Evaluation at Petroleum-Contaminated Sites, The Interstate Technology and Regulatory Council, https://tphrisk-1.itrcweb.org/5-conceptual-site-models-and-investigative-strategies/ (Jun, 24th 2021).
  •  
  • 4. 2018 Final Report on the Survey of Areas Concerned about Groundwater Pollution (Deokjin-gu, Jeonju-si, Jeollabuk-do)
  •  
  • 5. NTEPA, 2013, GUIDELINES ON CONCEPTUAL SITE MODELS, Northern Territory Environment Protection Authority (https://ntepa.nt.gov.au/__data/assets/pdf_file/0007/904327/draft_guidelines_conceptual_site_models.pdf).
  •  
  • 6. SNC-Lavalin, 2022, Preliminary Conceptual Site Models of Potential Contamination (https://www2.gov.bc.ca/assets/gov/environment/air-land-water/water/flood-response-and-the-environment/water-quality/preliminary_conceptual_site_models_of_potential_contamination.pdf).
  •  
  • 7. USACE, 2012, CONCEPTUAL SITE MODELS, US Army Corps of Engineers, EM 200-1-12 (https://www.publications.usace.army.mil/portals/76/publications/engineermanuals/em_200-1-12.pdf).
  •  
  • 8. USEPA, 2011, Environmental cleanup best management practices: effective use of the project life cycle conceptual site model, US Environmental Protection Agency, EPA 542-F-11-011 (https://clu-in.org/download/techdrct/csm-life-cycle-fact-sheet-final.pdf)
  •  

This Article

  • 2022; 27(S1): 64-74

    Published on Jul 31, 2022

  • 10.7857/JSGE.2022.27.S.064
  • Received on Jun 24, 2022
  • Revised on Jun 28, 2022
  • Accepted on Jul 18, 2022

Correspondence to

  • Soonjae Lee
  • 1SMART-SEM (Subsurface Environment Management) Research Center
    2Department of Earth and Environmental Science, Korea University

  • E-mail: soonjam@korea.ac.kr