• Site Suitability Analysis for Underground Dam Using Analytic Hierarchy Process
  • 계층분석과정을 이용한 지하댐 적지분석
  • 이상일;김병찬;
  • 동국대학교 토목환경공학과;동국대학교 토목환경공학과;
Abstract
The lack of water resources is becoming a serious issue throughout the world. The water shortage in Korea is expected to increase dramatically through 2020. The amount of water shortage could amount to 1.8 and 2.6 billion cubic meters in 2011 and 2020, respectively. Groundwater can be a solution to this matter in some places. Especially, underground dams are known to be advantageous over conventional dams, evert if they have some drawbacks such as their limited location for development and small sizes. The analytic hierarchy process(AHP) is an analytical tool, supported by simple mathematics, which enables one to explicitly rank tangible and intangible factors against each other for the purpose of resolving conflicts or setting priorities. In order to check the applicability of AHP to the evaluation of underground dam sites, lour candidate locations were chosen. They have suffered from problems like water-supply shortage and delayed dam construction. The analysis results are compared with those of the previous study using a conventional method. It is believed that the developed method can provide central or local government with a basis for reasonable decision-making regarding underground dam development.

전 세계적으로 물부족 사태는 매우 심각한 상황에 이르렀다. 우리나라도 예외는 아니어서 2011년에는 약 18억 $\textrm{m}^3$, 2020년에는 약 26억 $\textrm{m}^3$의 용수부족이 예상된다 지하수는 이러한 문제를 일부 지역에서 해결해 주는 역할을 할 수 있으며, 특히 지하댐은 위치와 규모의 제약에도 불구하고 지상댐이 지니고 있는 문제점들을 극복할 수 있다고 알려져 있다. 지하댐 적지분석을 위해 댐건설 지연과 물부족을 겪고 있는 네 지역을 선정하여, 갈등을 해결하고 대안의 우선순위를 결정하는 분석도구인 계층분석과정(AHP)을 작용하였다. 또한 AHP를 이용한 분석결과를 기존 연구와 비교하였다. 개발된 지하댐 적지분석 방법론은 중앙정부나 지방자치단체에게 합리적 의사결정을 위한 판단근거를 제공할 것으로 사료된다.

Keywords: Site Suitability Analysis;AHP;Underground dam;Groundwater;Water Supply;

Keywords: 적지분석;계층분석과정;지하댐;지하수;물공급;

References
  • 1. Hanson, G. and Nilsson, A. 'Ground-water Dams for Rural-Water Supplies in Developing Countries', Ground Water, 24(4), PP. 497-506 (1986)
  •  
  • 2. 부성안,이기철 '지하수뎀과해안지역 염수침입 방지기술', 농어촌과환경, 74 ,pp. 104-116 (2002)
  •  
  • 3. Molano, C., Bonilla, R, Mejia, J. and Rodnguez, C. Artificial Recharge of the Santa Marta Aquifer, Colombia, In Johnson, A. I. and Pyne, D. G. (eds), Artificial Recharge of Ground Water, G, ASCE, pp. 446-454 (1994)
  •  
  • 4. Liu, P., Liu, Z. and Duan, Z. A Case Study on Artificial Recharge of Groundwater Into the Coastal Aquifer in Longkou, China, In Johnson, A. I. and Pyne, D. G. (eds), Artificial Recharge of Ground Water, II, ASCE, pp. 464-470 (1994)
  •  
  • 5. 동국대학교, 지표수-지하수 연계이용 기법 개발(1차년도 연구보고서), pp. 46-49 (2002)
  •  
  • 6. 건설교통부. 한국수자원공사, 지하댐 개발방안수립조사 보고서, pp. 3-18 (2002)
  •  
  • 7. Saaty, T. L., The Analytic Hierarchy Process, McGraw-Hill, NewYork (1980)
  •  
  • 8. Zahedi, F. Data-Base Management System Evaluation and Selection Decision', Decision Science, 16(1), pp. 91-109 (1985)
  •  
  • 9. Min, H. 'Location Analysis of Intemational Consolidation Terminals Using the Analytic Hierarchy Process', Joumal of Business Loeistics, 15(2), pp. 25-45 (1994)
  •  
  • 10. 윤재곤 'AHP기법의 적용효과 및 한계 점에 관한 연구(MIS 성공요인평가를 위한 3가지 통계기법 비교중심)', 한국경영과학회지,21(3), pp. 109-124 (1996)
  •  
  • 11. 정병호, 조권익 '대형공사의 최적입찰자 신정을 위한 계층 분석과정(AHP)모형의 개발', 경영과학, 16(1), pp. 75-85 (1999)
  •  
  • 12. Drake, P. R. 'Using the Analytic Hierarchy Process in Engineering Education', Int. J. Engng. Ed., 14(3), pp. 191-196 (1998)
  •  
  • 13. Bevilacqua, M. and Braglia, M. 'The Analytic Hierarchy Process Applied to Maintenance Strategy Selection', ReIi-abitity Ensineerine and System Safety, 70, pp. 71-83 (2000)
  •  
  • 14. Ridgley, M. A. 'A Multicriteria Approach to Allocation Water During Drought', Resource Management and Optimiztion, 9(2), pp. 135-149 (1993)
  •  
  • 15. Jandric, Z. and Srdjevic, B. 'Analytic Hierarchy Process in Selecting Best Groundwater Pond', Proc. of 31st Intemational Geotogicat Coneress, Rio de janeiro, Brasit (2000)
  •  
  • 16. Jaber, J. O. and Mohsen, M. S. 'Evaluation of Non-conventional Water Resources Supply in Jordan, Desalination, 136(1-3), pp. 83-92 (2001)
  •  
  • 17. Thirumalaivasan, D. and Karmegam, M. 'Aquifer Vulnerability Assessment Using Analytic Hierarchy Process and GIS for Upper Palar Warershed', The 22nd Asian Conference on Remote Sensins, Singapore (2001)
  •  
  • 18. 이상일, 손상철 '계층분석과정에 의한지 표수-지하수 연계 이용 적지분석', 한국지하수토양환경학회 춘계학술대회논문집, pp. 307-310 (2002)
  •  
  • 19. 이상일, 서혜경, 손상철 '지표수-지하수 연계이용을 위한지역 적합도 평가', 한국지하수토양환경학회 추계학술발표회, pp. 171-174 (2002)
  •  
  • 20. 이상일 '지하수와 지표수의 연계 개발 및 관리 방안', 세계물의 해 심포지움(21세기 지하수자원의 지속가능한개발, 이용 및 관리) 발표논문집, 한국지하수토양환경학회,pp. 79-90 (2003)
  •  
  • 21. Lee, S. I. and Kim, B. C. 'Evaluation of Groundwater Dam Sites for Emergency Water Supply', 23rd General Assem-bty of the International Union of Geodesy and Geophysics (IUGG 2003), Sapporo, Japan, Abstracts (Week B), p. B353 (2003)
  •  
  • 22. 건설교통부, 지하수관리 기본계획, pp. 52-54 (2002)
  •  
  • 23. 한국수자원공사, 지하수 함양 및 활용증 대방안 연구, pp. 171-173 (1999)
  •  
  • 24. Nissen-Petersen, E. 'Water from Sand-Rivers', 23rd WECD Conference, South Africa, pp. 394-396 (1997)
  •  
  • 25. Print, C. R. 'Subsurface Dam for a Pastoral Environment', 23rd WECD Conference, South Africa, pp. 401-403 (1997)
  •  
  • 26. Foster, S. 'Subsurface Dams to Augment Groundwater Storage in Basement Terrain for Human Subsistence-Brazilian Expehence', World Bank, Case Profile Collection No. 5 (2002)
  •  
  • 27. Saaty, T. L. 'A Scaling Method for Piiorities in HierarChi-cal Structures', Journal of Mathematical Psycholoey, 15, pp. 234-281 (1977)
  •  
  • 28. Saaty, T. L. 'Priority Setting in Complex Problems', IEEE Transaction on Engineering Management, 30(3), pp. 140-155 (1983)
  •  
  • 29. Saaty, T. L., 'Rank Generation, Preservation and Reversal in the Analytic Hierarchy Decision Process', Decision Sciences, 18, pp. 157-177 (1987)
  •  
  • 30. Harker, P. T. and Vargas, L. G. 'Theory of Ratio Scale Esti-mation: Saaty's Analytic Hierarchy Process', Manasement Science, 33(11), pp. 1,383-1,403 (1987)
  •  
  • 31. 건설교통부, 수자원장기종합계획 (2001)
  •  
  • 32. 건설교통부, 댐건설장기계획(2001)
  •  
  • 33. 건설교통부. 한국수자원공사, 지표수 및 지하수 연계사업 기본조사 보고서 (1998)
  •  

This Article

  • 2003; 8(4): 36-44

    Published on Dec 1, 2003