Drilling at unconsolidated layer can make the aquifer disturbed and reduce a productivity of groundwater well. Surge block and air surging were applied to a pumping well located in Jeungsan-ri, Changnyung-gun, to improve a well efficiency by removing clogging and fine-grained slime. Two experimental log-linear equations,
$y_1=-0.1769\;ln(x_1)+0.4960$ and
$y_2=-84.3358\;ln(x_2)+512.8162$, were proposed in this site, in which
$x_1$ and
$x_2$ are the number of surging event,
$y_1$ is the amount of slime, and
$y_2$ is a recovery time of groundwater level after air surging. Well loss exponent (P) decreased after surging, from 3.422 to 1.439, and the groundwater inflow from aquifer happened in all directions around a well with gradually increasing the homogeneity in a local aquifer's hydraulic property. It was revealed that long-term well development should be done in the pumping well which is located in unconsolidated sediments to increase a well productivity.
Keywords: Well development;Well efficiency;Clogging;Slime;Unconsolidated layer;